Soil Remediation Services in Utah, Utah
When oil tank leaks contaminate soil, professional remediation is required to protect groundwater and comply with Utah environmental regulations. Our listed contractors in Utah specialize in petroleum contamination cleanup overseen by Utah Department of Environmental Quality (DEQ).
About Soil Remediation in Utah
Soil remediation involves removing or treating soil contaminated by leaking oil tanks. The extent of remediation depends on contamination levels, soil type (Desert and clay soil in your area), proximity to wells or water bodies, and Utah cleanup standards. Utah Department of Environmental Quality (DEQ) sets the requirements for remediation in Utah.
Limited residential use. Natural gas dominant for heating.
When You Need Soil Remediation
- Contamination discovered during tank removal
- Failed soil tests showing petroleum levels above {state} limits
- Required for property sale with known contamination
- Protect drinking water wells and groundwater
- Eliminate ongoing environmental liability
- Required by {regulatoryBody} when contamination is reported
The Remediation Process in Utah
- 1Initial site assessment and soil sampling
- 2Laboratory analysis to determine contamination extent
- 3Develop remediation plan approved by Utah Department of Environmental Quality (DEQ)
- 4Excavate contaminated soil
- 5Transport contaminated soil to licensed treatment facility
- 6Collect confirmation soil samples
- 7Backfill with certified clean fill
- 8Submit closure report to Utah Department of Environmental Quality (DEQ)
- 9Obtain No Further Action letter
Utah Regulations
Regulatory Body: Utah Department of Environmental Quality (DEQ)
Permit Required: Yes
Permit Cost: $75-175
Notable Requirements: DEQ Underground Storage Tank Program. Petroleum Storage Tank Fund.
Soil Remediation FAQs for Utah
How much does soil remediation cost in Utah?
Soil remediation costs in Utah typically range from $10,000-40,000. Costs depend on the volume of contaminated soil, depth of contamination, and proximity to groundwater. Minor contamination may cost $10,000-15,000, while extensive contamination can exceed $50,000.
How long does soil remediation take?
Simple remediation projects in Utah can be completed in 1-2 weeks. More extensive contamination requiring multiple rounds of excavation and testing may take 4-8 weeks or longer.
Is there financial assistance for remediation in Utah?
Utah may offer financial assistance through state petroleum cleanup funds. Contact Utah Department of Environmental Quality (DEQ) to learn about eligibility for cleanup cost reimbursement programs.
What contamination levels require remediation?
Utah has specific soil cleanup standards for petroleum contamination. Generally, total petroleum hydrocarbons (TPH) above 100-500 ppm require remediation, but standards vary based on land use and groundwater proximity.
Find Utah Contractors
Get free quotes from licensed remediation professionals in your area.
Browse UT Contractors